help with getting UPPCB consents, factory licenses, and hazardous waste approvals, you can get assistance from Certilize.
Frequently Asked Questions
1. What licenses are required to start a non-ferrous metal manufacturing unit in Uttar Pradesh?
A non-ferrous metal manufacturing unit may require factory registration and license, UPPCB Consent to Establish and Consent to Operate, hazardous-waste authorization where applicable, fire-related approvals and other permissions depending on the plant’s processes, location and capacity.
2. Is UPPCB approval mandatory for a metal manufacturing unit?
Where the proposed activity falls within the consent requirements, the unit must obtain applicable UPPCB consent. CTE is required before establishing the industry, while CTO is required before commencing production or trial production.
3. What is Consent to Establish (CTE) in Uttar Pradesh?
Consent to Establish is an environmental approval obtained before establishing an applicable industrial unit. It allows the entrepreneur to proceed with setting up the industry subject to the conditions prescribed by the pollution control authority.
4. What is Consent to Operate (CTO) for a manufacturing unit?
Consent to Operate is required before an applicable manufacturing unit begins production, including trial production. It is issued subject to compliance with applicable pollution-control requirements and conditions.
See also: How to Extend the Life of Older Systems with the Right RAM Upgrade
5. Is a factory license required for a metal manufacturing plant in Uttar Pradesh?
A factory registration and license may be required depending on whether the establishment meets the applicable factory thresholds and other requirements. Uttar Pradesh’s Nivesh Mitra system provides for factory plan approval and factory registration/licensing.
6. What is Nivesh Mitra and how does it help manufacturers?
Nivesh Mitra is Uttar Pradesh’s single-window system for business approvals. Entrepreneurs can use it to identify required approvals, submit applications, pay applicable fees and track regulatory permissions.
7. Can production begin after obtaining CTE?
No. CTE and CTO serve different purposes. Where CTO is applicable, it must be obtained before actual commencement of production, including trial production.


